Notice:

NEWS
MORE
2011 Bridge Conference successfully concluded
2011 Bridge Conference successfully concludedOctober 21, 2011 National Bridge Conference in Shangyu City, Zhejiang Province
held a grand rally. The meeting was organized by the Institution of Highways and
bridges and structural engineering branch, Jiashao Crossing the River Bridge
Construction Headquarters, the meeting will last two days. Delegates more than
300 people, my general manager of the Linqing An invited to participate in the
meeting. A new meeting was chaired by vice chairman and secretary general
of the China Highway Society Lu presided. Shaoxing City Mayor Yang Wenxiao,
chairman of the Institution of Highways and Zhang Xigang, international Qiaoxie
Vice Chairman Geyao Jun at the meeting gave a speech.The General Assembly on
the China Academy of Engineering, Cheng are connected Engineering Vibration,
DONG Shi-lin academicians on Reinforced with concrete arch bridge in ring
continuous casting Summary of bridge seismic isolation, damping control
application of the latest developments in technology "- span the spatial
structure in our application and development of "a speech.
